Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Honeywell Betting on Rising Global Natural Gas Consumption with Air Products Deal
    • Golar Setting Stage for Argentina’s LNG Exports by 2027 with Pan American Energy
    • LNG decarbonisation strategies for a cleaner future
    • Natural Gas Futures Trade Even as Market Waits for Hotter Weather, Freeport LNG Restart
    • ENI drafts ABL for Congo floating LNG transportation and installation verification
    • Vitol Doubles Down on LNG Marine Fuel Growth with Bunkering Vessel Deals
    • MET Group secures long-term US LNG source from Shell
    • AG&P LNG and BKLS sign LNG agreement.
    Hydrowav
    • Home
    • LNG News
    • Industry Trends
    • Latest News
    • Market Analysis
    Hydrowav
    Industry Trends

    YPF explores Vaca Muerta boundaries

    Team_HydrowavBy Team_HydrowavJune 17, 2024No Comments2 Mins Read

    [ad_1]

    YPF SA has completed the first phase of its unconventional Vaca Muerta exploration project in Mendoza province, Argentina, and is set to move forward with another pad of wells in a second phase next year.

    The unconventional pilot project, YPF’s first in Mendoza, began in second-quarter 2023 and has provided geological data to help interpret and characterize the formation’s conditions at the Mendoza edge.

    Phase one wells drilled in the southern end of Malargüe struck oil, enabling the company to push the productive boundaries of the formation beyond the core area of Neuquén province.

    As part of work to explore Vaca Muerta, commitments were made in blocks CN VII A and Paso Bardas Norte. In CN VII A, the Aguada Negra vertical well was drilled to a depth of 2,576 m with a horizontal branch of 1,074 m, while in Paso Bardas Norte, a horizontal well of 1,059 m was drilled.

    After drilling, 25 hydraulic fracturing stages were performed (12 in Paso Bardas Norte, 13 in Aguada Negra), with testing beginning Feb. 18 to assess reservoir levels. The wells are currently showing promising oil productivity data, the company said.

    For the second exploration phase in 2025, YPF plans a vertical pilot and two horizontal branches of 2,500 m at greater depths in the CN VII A block.

     

    [ad_2]

    Source link

    Previous ArticleNewsletter: The Alliance speaks up for Indigenous LNG. And we link to Equitable Origin.
    Next Article Gas to Growth: A report by Philip Cross in collaboration with Resource Works and the First Nations LNG Alliance
    Team_Hydrowav
    • Website

    Related Posts

    Industry Trends

    WoodMac: Four questions answered on the future of oil demand

    July 10, 2024
    Industry Trends

    SOCAR’s Baku refinery starts up fuels plant under modernization program

    July 8, 2024
    Industry Trends

    Egypt’s Midor completes expansion, modernization of Alexandria refinery

    July 8, 2024
    Add A Comment
    Leave A Reply Cancel Reply

    Categories
    • Industry Trends
    • Latest News
    • LNG News
    • Market Analysis
    Categories
    • Industry Trends
    • Latest News
    • LNG News
    • Market Analysis
    • Privacy Policy
    • Disclaimer
    • Terms & Conditions
    • About us
    • Contact us
    Copyright © 2024 Hydrowav.com All Rights Reserved.

    Type above and press Enter to search. Press Esc to cancel.