Close Menu
  • Home
  • Buy Now
Facebook X (Twitter) Instagram
Trending
  • Honeywell Betting on Rising Global Natural Gas Consumption with Air Products Deal
  • Golar Setting Stage for Argentina’s LNG Exports by 2027 with Pan American Energy
  • LNG decarbonisation strategies for a cleaner future
  • Natural Gas Futures Trade Even as Market Waits for Hotter Weather, Freeport LNG Restart
  • ENI drafts ABL for Congo floating LNG transportation and installation verification
  • Vitol Doubles Down on LNG Marine Fuel Growth with Bunkering Vessel Deals
  • MET Group secures long-term US LNG source from Shell
  • AG&P LNG and BKLS sign LNG agreement.
Hydrowav
  • Home
  • LNG News
  • Industry Trends
  • Latest News
  • Market Analysis
Hydrowav
Industry Trends

SOCAR’s Baku refinery starts up fuels plant under modernization program

Team_HydrowavBy Team_HydrowavJuly 8, 2024No Comments2 Mins Read

[ad_1]

State Oil Co. of Azerbaijan Republic (SOCAR) has completed construction and startup of a complex dedicated to production of Euro 5-quality gasoline and diesel as part of the ongoing modernization and reconstruction program at the operator’s more than 6-million tonnes/year (tpy) Heydar Aliyev refinery at Baku in Azerbaijan.

With construction on the complex’s diesel and gasoline plants wrapped and many of its installations now operable, the refinery’s production of AI-92 and AI-95 gasolines—Azerbaijan’s Euro 5-quality equivalent gasoline specifications—have already been brought up to Euro-5 standards, SOCAR said on June 30.

While it did not disclose capacity details, the operator said completion of the fuel complex now allows the refinery to meet Azerbaijan’s full demand for Euro 5-quality gasoline (EU-95) with domestic production.

Based on current market conditions, SOCAR said it expects the refinery’s supply of locally produced EU-95 gasoline will decrease the per liter cost of gasoline in the country by July 15.

SOCAR did not reveal a timeframe for when production of Euro 5-quality diesel from the recently completed fuels complex will begin.

In addition to boosting the refinery’s supply of cleaner fuels for domestic and export markets, as well as reducing environmental impacts at the site, the Baku refinery’s ongoing modernization and upgrading project predominantly aims to boost overall crude oil processing capacity at the manufacturing hub to 7.5 million tpy (OGJ Online, Apr. 18, 2022; Feb. 3, 2021; Dec. 6, 2018).

Ongoing modernization works at the site resulted in the Baku refinery processing nearly 6.3 million tpy of crude during 2023, up about 100,000 tpy from 2022, SOCAR said in a Feb. 9 release.

 

[ad_2]

Source link

Previous ArticleU.S. Natural Gas Operators Said Looking to Measure Methane Intensity as European Scrutiny Rises
Next Article Making moves with modular regasification terminals
Team_Hydrowav
  • Website

Related Posts

Industry Trends

WoodMac: Four questions answered on the future of oil demand

July 10, 2024
Industry Trends

Egypt’s Midor completes expansion, modernization of Alexandria refinery

July 8, 2024
Industry Trends

Some E&P firms reining in ’25 capex plans, Dallas Fed survey says

July 2, 2024
Add A Comment
Leave A Reply Cancel Reply

Categories
  • Industry Trends
  • Latest News
  • LNG News
  • Market Analysis
Categories
  • Industry Trends
  • Latest News
  • LNG News
  • Market Analysis
  • Home
  • Buy Now
Copyright © 2024 Hydrowav.com All Rights Reserved.

Type above and press Enter to search. Press Esc to cancel.