Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Honeywell Betting on Rising Global Natural Gas Consumption with Air Products Deal
    • Golar Setting Stage for Argentina’s LNG Exports by 2027 with Pan American Energy
    • LNG decarbonisation strategies for a cleaner future
    • Natural Gas Futures Trade Even as Market Waits for Hotter Weather, Freeport LNG Restart
    • ENI drafts ABL for Congo floating LNG transportation and installation verification
    • Vitol Doubles Down on LNG Marine Fuel Growth with Bunkering Vessel Deals
    • MET Group secures long-term US LNG source from Shell
    • AG&P LNG and BKLS sign LNG agreement.
    Hydrowav
    • Home
    • LNG News
    • Industry Trends
    • Latest News
    • Market Analysis
    Hydrowav
    Industry Trends

    YPF begins construction of Vaca Muerta Sur

    Team_HydrowavBy Team_HydrowavJune 18, 2024No Comments2 Mins Read

    [ad_1]

    State-owned Yacimientos Petrolíferos Fiscales (YPF) has started construction of the first 130 km of the planned 600-km Vaca Muerta Sur oil pipeline in Argentina (OGJ Online, Feb. 12, 2024).

    Phase one of the pipeline project will extend between Añelo, in Neuquén, and Allen, in Río Negro, where it will connect with the Oldelval system, Argentina’s largest oil pipeline network. The project aims to strengthen the oil transportation system in the Neuquén basin, maximizing transport capacity towards refineries and the port of Bahía Blanca.

    Construction on the first pipeline segment began in the Loma Campana area, operated by YPF in partnership with Chevron. Once completed, pipeline operations will be managed by a new consortium, similar to the Oldelval system.

    At maximum operational capacity, the pipeline will allow for transport of 390,000 b/d, increasing the oil evacuation capacity of the Neuquén basin by 70% and doubling the current capacity of the Vaca Muerta area.

    Phase two of the pipeline project—including the export terminal in the Punta Colorada area, near Sierra Grande, Río Negro province—is currently under development. Once completed, Vaca Muerta Sur will allow the export of 135 million bbl/year, making Argentina one of the main exporters in the region.

    The project includes construction of the largest tank farm in Argentina and two floating monobuoys sited 6 km offshore.

    [ad_2]

    Source link

    Previous ArticleChevron Shuts Down Wheatstone LNG for Repairs, Tightening Global Natural Gas Market
    Next Article NNPC signs project development agreement with Golar LNG
    Team_Hydrowav
    • Website

    Related Posts

    Industry Trends

    WoodMac: Four questions answered on the future of oil demand

    July 10, 2024
    Industry Trends

    SOCAR’s Baku refinery starts up fuels plant under modernization program

    July 8, 2024
    Industry Trends

    Egypt’s Midor completes expansion, modernization of Alexandria refinery

    July 8, 2024
    Add A Comment
    Leave A Reply Cancel Reply

    Categories
    • Industry Trends
    • Latest News
    • LNG News
    • Market Analysis
    Categories
    • Industry Trends
    • Latest News
    • LNG News
    • Market Analysis
    • Privacy Policy
    • Disclaimer
    • Terms & Conditions
    • About us
    • Contact us
    Copyright © 2024 Hydrowav.com All Rights Reserved.

    Type above and press Enter to search. Press Esc to cancel.